The paved path that runs behind Pequannock's municipal building and the newer trail off Doty Road in Wanaque were built on the same railroad. The Pompton Valley Rail Trail follows the old bed of the New York and Greenwood Lake Railway, which the Erie railroad later bought. Passaic County's Highlands Rail Trail was planned along that same former railway, which once ran through Pompton Lakes, Wanaque, Bloomingdale, Ringwood and West Milford.
The trail you use in Pompton Plains is the middle section of a longer line. The North Jersey Transportation Planning Authority puts the break between the two trails at about 2.25 miles. A second break, about 0.1 mile, sits at the Wayne end, between the trail and NJ TRANSIT's Mountain View Station. NJTPA is now studying both, and the schedule runs into the middle of 2027.
The Line, North to South
Here's how the pieces fit together, using the measurements the counties and NJTPA have published.
| Segment | Where it runs | Length | Status as of November 2026 |
|---|---|---|---|
| Highlands Rail Trail, Phase II | North from Phase I to Conklintown Road, Wanaque | About 1.4 miles | Under design |
| Highlands Rail Trail, Phase I | Union Avenue to F.A. Orechio Drive, Wanaque | About 1.72 miles | Open |
| Northern gap | Wanaque's southern trail end to the River Drive end in Pequannock | About 2.25 miles | Being studied |
| Pompton Valley Rail Trail | River Drive, Pequannock, to Mountain View Boulevard, Wayne | 5.1 miles | Open since May 2025 |
| Southern gap | Trail's south end to Mountain View Station | About 0.1 mile | Being studied |
Add up the open sections and you get roughly 6.8 miles of finished trail on the two sides of the northern gap. The missing link between them is longer than the whole first phase in Wanaque.
What Pompton Plains Already Has
Morris County held the ribbon cutting for the Pompton Valley Rail Trail on May 29, 2025. According to New Jersey Hills, the ceremony took place behind the Pequannock Township First Aid & Rescue Squad and the municipal building, at 528 and 530 Newark Pompton Turnpike. Patch reported that the path is 10 feet wide, paved and fully accessible, with upgraded crossings that have high-visibility warning signals and tactile surfaces, plus a bridge over the Pompton River. On its project page, Morris County says the trail is separated from traffic except at street crossings.
In Pequannock, the route passes three township parks and a reminder of where it came from:
- Pequannock Valley Park, at Marvin Road and Alexander Avenue
- Washington Park, which has trail parking
- Cherry Street Park
- The Museum of Pequannock Township, inside the old Pompton Plains Railroad Station at 33 Evans Place
The station building is the clearest sign of how the line was laid out. Trains used to stop where Evans Place meets the trail. The study NJTPA started this year is asking how far north that old line can be reopened for walking and biking.
The Northern Gap, and What Sits Beyond It
North of Pompton Plains, Passaic County opened Phase I of the Highlands Rail Trail in fall 2025. It runs about 1.72 miles from Union Avenue to F.A. Orechio Drive and turns a former railway corridor into a greenway for walking and biking. The county's opening-day advisory listed an entrance across from 15 Doty Road. Phase II would add about 1.4 miles north to Conklintown Road. The county's project page currently lists it as under design.
Passaic County has a bigger plan for that line. Its plan for the Highlands Rail Trail says a future southern extension into Pompton Lakes could connect to the Morris Canal Greenway, which is planned to end in that borough. The county describes the result as "a continuous bicycle and pedestrian pathway spanning the entire length of Passaic County." The same plan points to trail extensions farther north that could link to NY/NJ Trails Conference trails and on into New York State.
The 2.25-mile stretch from the River Drive end is the piece that would put Pompton Plains on that network. Without it, the Pequannock trail and the Wanaque trail are two separate walks. With it, they would form one corridor along the old railroad.
The Southern Gap Is a Tenth of a Mile
At the Wayne end, the trail stops at Mountain View Boulevard, near NJ TRANSIT's Mountain View Station. NJTPA puts the distance from there to the station at about 0.1 mile, or roughly 500 feet. That gap is small, but the destination matters. On the northern gap, the study is about extending a recreation path. On the southern gap, it's about whether a 5.1-mile trail running through Pequannock ends up connected directly to a train station.
NJTPA's study page lists both questions under the same project, the Pompton Valley Rail Trail Extension. It says the study "explores options for connecting the existing Highlands Rail Trail and the Pompton Valley Rail Trail" and "will also examine a possible connection" to Mountain View Station.
Who Is Doing the Work, and When
The study is a partnership. NJTPA is working with the New Jersey Bike and Walk Coalition and Rails to Trails Conservancy, the groups leading the North Jersey Trail Network initiative. That network covers Bergen, Essex, Hudson, Morris, Passaic and Union counties. NJTPA's June 2026 committee agenda names NV5 as prime consultant, with Mercer Planning Associates as subconsultant. The scope is planning-level work. The team will look at possible preliminary routes and alternatives, then make recommendations.
The schedule NJTPA set out for the consultant work:
- March 2026: work begins
- Late summer 2026: public survey and pop-up outreach. NJTPA scheduled tables at the Pompton Lakes concert series and at farmers markets in Riverdale, Madison and Summit.
- September 7, 2026: online survey closes
- March 31, 2027: draft final report due
- May 30, 2027: revised draft due
- June 30, 2027: study complete
The survey asked people who walk, bike or roll where trail connections could be made safer and easier, and where missing links or crossings stop them from continuing a trip. When the survey opened, Morris County Commissioner Stephen H. Shaw, Third Vice Chair of the NJTPA Board of Trustees, told Parsippany Focus that "your knowledge and experience of our trails helps us identify opportunities to improve safety and make our trail network even better."
The survey is closed. The next date on the consultant schedule is March 31, 2027, when the draft final report is due to NJTPA. Updates are posted on NJTPA's trails page.
The Trail This November
The study will take months. The 5.1 miles already built are open now. Washington Park is the listed trail parking spot. For a walk that ends at the old railroad station, head for Evans Place and the Museum of Pequannock Township.
If you're already planning a stop at Pequannock Valley Park, the township's Fall Community Shred Day is there on Saturday, November 7, from 9 a.m. to 1 p.m., at Marvin Road and Alexander Avenue. The park is on the trail, so you can drop off old paperwork and then walk south toward Washington Park and Cherry Street Park.
We walk this trail too, and we'll be following the study as it moves toward its June 2027 finish. If you're wondering how a trail like this factors into your home's value, Francesca Messercola and our team are happy to walk you through it. Ask us for a free home valuation and we'll put it in local context for you.